Nortel Communication Server 1000Nortel Communication Server 1000 Release 5.0Communication Server 1000EInstallation and CommissioningDocument Number: N
Page 10 of 466 Contents NN43041-310 Standard 01.11 October 2008Installing Line cards andcross-connecting telephones . . . . . . . . . . . . . . . .
Page 100 of 466 Installing system groundsNN43041-310 Standard 01.11 October 2008Grounding equipment in the UKFollow Procedure 8 to ground equipment i
Page 101 of 466Communication Server 1000E Installation and Commissioning116Installing and connecting CS 1000E hardwareContentsThis section contains in
Page 102 of 466 Installing and connecting CS 1000E hardwareNN43041-310 Standard 01.11 October 2008• Procedure 10: "Connecting Campus Redundant C
Installing and connecting CS 1000E hardware Page 103 of 466Communication Server 1000E Installation and CommissioningFor detailed information on Camp
Page 104 of 466 Installing and connecting CS 1000E hardwareNN43041-310 Standard 01.11 October 2008information, see Communication Server 1000: System
Installing and connecting CS 1000E hardware Page 105 of 466Communication Server 1000E Installation and CommissioningProcedure 11Installing a DSP Dau
Page 106 of 466 Installing and connecting CS 1000E hardwareNN43041-310 Standard 01.11 October 20085 The existing 3-port SDI cable (NTBK48AA) is reuse
Installing and connecting CS 1000E hardware Page 107 of 466Communication Server 1000E Installation and CommissioningFigure 232-port SDI cable (NTAK1
Page 108 of 466 Installing and connecting CS 1000E hardwareNN43041-310 Standard 01.11 October 2008port of the call server, while the CT connects to t
Installing and connecting CS 1000E hardware Page 109 of 466Communication Server 1000E Installation and CommissioningFigure 24MGC faceplateNote: The
Contents Page 11 of 466Communication Server 1000E Installation and CommissioningInstalling and cross-connecting a Power Fail Transfer Unit . . . .
Page 110 of 466 Installing and connecting CS 1000E hardwareNN43041-310 Standard 01.11 October 2008Figure 25Elan connection (CP PM Call Server)
Installing and connecting CS 1000E hardware Page 111 of 466Communication Server 1000E Installation and CommissioningFigure 26Elan connections (MGC)
Page 112 of 466 Installing and connecting CS 1000E hardwareNN43041-310 Standard 01.11 October 2008Figure 27Ethernet connections for CP PM Signaling S
Installing and connecting CS 1000E hardware Page 113 of 466Communication Server 1000E Installation and Commissioning• TLAN (telephony) network inter
Page 114 of 466 Installing and connecting CS 1000E hardwareNN43041-310 Standard 01.11 October 2008Connecting a Media Card to the ELAN subnetFollow Pr
Installing and connecting CS 1000E hardware Page 115 of 466Communication Server 1000E Installation and CommissioningConnecting a Media Card to the T
Page 116 of 466 Installing and connecting CS 1000E hardwareNN43041-310 Standard 01.11 October 2008Figure 30Media Gateway and Media Gateway Expander c
Page 117 of 466Communication Server 1000E Installation and Commissioning150Installing software on the CS 1000EContentsThis section contains informatio
Page 118 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008Installing the softwareThis section provides the steps invo
Installing software on the CS 1000E Page 119 of 466Communication Server 1000E Installation and CommissioningThe VxWorks banner screen appears (see F
Page 12 of 466 Contents NN43041-310 Standard 01.11 October 2008
Page 120 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 20085 The Software Installation Tool Main Menu appears (see Fig
Installing software on the CS 1000E Page 121 of 466Communication Server 1000E Installation and Commissioning6 Enter <CR> or u to access the In
Page 122 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 20089 The Install Menu appears (see Figure 36 on page 122). Ent
Installing software on the CS 1000E Page 123 of 466Communication Server 1000E Installation and Commissioning11 The location information screen appea
Page 124 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008Figure 40Confirm software version14 Enter <CR> or y t
Installing software on the CS 1000E Page 125 of 466Communication Server 1000E Installation and CommissioningFigure 42Centralized Software Upgrade16
Page 126 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008Figure 44Installation Status Summary17 Enter <CR> or
Installing software on the CS 1000E Page 127 of 466Communication Server 1000E Installation and Commissioning18 A prompt appears warning you that old
Page 128 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008Figure 48Database installation22 Enter a.23 The Installatio
Installing software on the CS 1000E Page 129 of 466Communication Server 1000E Installation and CommissioningFigure 49Installation Status Summary24 T
Page 13 of 466Communication Server 1000E Installation and Commissioning20List of ProceduresProcedure 1Removing the cover . . . . . . . . . . . . . .
Page 130 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008Figure 50Install Menu25 Enter <CR> or y to confirm yo
Installing software on the CS 1000E Page 131 of 466Communication Server 1000E Installation and Commissioning26 Enter <CR> or y to reboot the s
Page 132 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008Reconfigure I/O ports and call registersProcedure 19Reconfi
Installing software on the CS 1000E Page 133 of 466Communication Server 1000E Installation and CommissioningTest the CP PM Call Server Procedure 21T
Page 134 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008Verifying CP PM Call Server 0 is activeUse the following co
Installing software on the CS 1000E Page 135 of 466Communication Server 1000E Installation and Commissioning3 Tier 1 and Tier 2 health of both CP PM
Page 136 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008.stat healthLocal (Side 0, Active, Redundant):Components wi
Installing software on the CS 1000E Page 137 of 466Communication Server 1000E Installation and CommissioningTIER 2 Health Count Breakdown:==========
Page 138 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 20084 Get status of links to the Media Gateways (STAT IPL).End
Installing software on the CS 1000E Page 139 of 466Communication Server 1000E Installation and CommissioningComplete the CP PM installationTesting t
Page 14 of 466 List of ProceduresNN43041-310 Standard 01.11 October 2008Procedure 14Inserting a Shielded 50-pin to Serial/ELAN/TLAN adapter . . . .
Page 140 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 20084 Test system redundancy and media devices:5 Clear the disp
Installing software on the CS 1000E Page 141 of 466Communication Server 1000E Installation and CommissioningProcedure 26Testing CP PM Call Server 1F
Page 142 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 20085 Clear the display and minor alarms on both CP PM Call Ser
Installing software on the CS 1000E Page 143 of 466Communication Server 1000E Installation and CommissioningPerform a customer backup data dump (ins
Page 144 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008The MGC must be given a superloop and shelf reference on th
Installing software on the CS 1000E Page 145 of 466Communication Server 1000E Installation and CommissioningThe MGC Shells can be accessed using the
Page 146 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 20082 Enter port and security parameters, if required:Change MG
Installing software on the CS 1000E Page 147 of 466Communication Server 1000E Installation and CommissioningTLAN set to auto negotiate.ELAN set to a
Page 148 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008000 IPMG ---- -- - - -- - - 001 --- ---------
Installing software on the CS 1000E Page 149 of 466Communication Server 1000E Installation and CommissioningRebooting the MGC The MGC reboots and re
List of Procedures Page 15 of 466Communication Server 1000E Installation and CommissioningProcedure 32Configuring pseudo-terminals (PTYs) . . . . .
Page 150 of 466 Installing software on the CS 1000ENN43041-310 Standard 01.11 October 2008-> Received an upgrade request. Preparing MGC for upgrad
Page 151 of 466Communication Server 1000E Installation and Commissioning172Configuring the CS 1000E CP PM Call ServerContents This section contains in
Page 152 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008IntroductionThe CS 1000E system requires the configu
Configuring the CS 1000E CP PM Call Server Page 153 of 466Communication Server 1000E Installation and CommissioningConfiguring login IDs and passwor
Page 154 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008LOCK<enter to accept default or set to required s
Configuring the CS 1000E CP PM Call Server Page 155 of 466Communication Server 1000E Installation and Commissioning15 Enter the command:PASSWORD (us
Page 156 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008Enabling the multi-user optionFollow Procedure 31 to
Configuring the CS 1000E CP PM Call Server Page 157 of 466Communication Server 1000E Installation and CommissioningConfiguring pseudo-terminals (PTY
Page 158 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008System response:CFN000MEM AVAIL:(U/P):1019254 USED U
Configuring the CS 1000E CP PM Call Server Page 159 of 466Communication Server 1000E Installation and Commissioning10 Enter the command:TTYLOG NO11
Page 16 of 466 List of ProceduresNN43041-310 Standard 01.11 October 2008Procedure 49Configure conference TDS (CLI) . . . . . . . . . . . . . . . .
Page 160 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008TTY 13: DSBL DES: ether 2TTY 14: DSBL DES: ether 33
Configuring the CS 1000E CP PM Call Server Page 161 of 466Communication Server 1000E Installation and CommissioningConfiguring the MG 1000E Bandwidt
Page 162 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008End of ProcedureLD 117 – Bandwidth management zone c
Configuring the CS 1000E CP PM Call Server Page 163 of 466Communication Server 1000E Installation and CommissioningThe type of any Bandwidth Managem
Page 164 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008Configuring Digitone ReceiversDigitone Receivers mus
Configuring the CS 1000E CP PM Call Server Page 165 of 466Communication Server 1000E Installation and CommissioningConfiguring Tone DetectorsTone De
Page 166 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008Note: This procedure requires Service Pack 1 and Jav
Configuring the CS 1000E CP PM Call Server Page 167 of 466Communication Server 1000E Installation and CommissioningFigure 53The Element Manager logi
Page 168 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008Importing preconfigured IP telephony filesFollow Pro
Configuring the CS 1000E CP PM Call Server Page 169 of 466Communication Server 1000E Installation and Commissioning1 Select System > IP Network &
List of Procedures Page 17 of 466Communication Server 1000E Installation and CommissioningProcedure 67Adding a Voice Gateway Media Card to an IP tel
Page 170 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008Reviewing and submitting IP telephony node configura
Configuring the CS 1000E CP PM Call Server Page 171 of 466Communication Server 1000E Installation and CommissioningFigure 56Call Server Backup and R
Page 172 of 466 Configuring the CS 1000E CP PM Call ServerNN43041-310 Standard 01.11 October 2008Figure 57CS 1000E Backup3 Select Backup from the Act
Page 173 of 466Communication Server 1000E Installation and Commissioning238Installing a Signaling ServerContentsThis section contains information on t
Page 174 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008IntroductionThis chapter contains general instructions to install
Installing a Signaling Server Page 175 of 466Communication Server 1000E Installation and Commissioningrack mounting, as opposed to two-post rack mou
Page 176 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Table 14Readiness checklist (Part 1 of 2)Have you:Read all safety
Installing a Signaling Server Page 177 of 466Communication Server 1000E Installation and CommissioningInstalling the CP PM Signaling Server hardware
Page 178 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008This section contains general instructions for installing the CP
Installing a Signaling Server Page 179 of 466Communication Server 1000E Installation and CommissioningConnectionsConnection checklist Before connec
Page 18 of 466 List of ProceduresNN43041-310 Standard 01.11 October 2008Procedure 85Importing an existing node . . . . . . . . . . . . . . . . . . .
Page 180 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008CS 1000M system respectively. It also contains instructions for c
Installing a Signaling Server Page 181 of 466Communication Server 1000E Installation and CommissioningFigure 58Faceplates of the Nortel CP PM server
Page 182 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Procedure 38Connecting a Nortel CP PM Signaling ServerNote: Refer
Installing a Signaling Server Page 183 of 466Communication Server 1000E Installation and Commissioning5 Set the COM port on the maintenance terminal
Page 184 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008— Insert the end of a longer RJ-45 CAT5 Ethernet cable (not suppl
Installing a Signaling Server Page 185 of 466Communication Server 1000E Installation and CommissioningProcedure 40Connecting a CP PM Signaling Serve
Page 186 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 59IBM X306m Signaling Server (rear view)Note: Refer to Fig
Installing a Signaling Server Page 187 of 466Communication Server 1000E Installation and Commissioning5 Set the baud rate for the serial port on the
Page 188 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Procedure 42Connecting an HP DL320-G4 Signaling Server1 Connect t
Installing a Signaling Server Page 189 of 466Communication Server 1000E Installation and CommissioningInstalling the Signaling Server softwareIntrod
List of Procedures Page 19 of 466Communication Server 1000E Installation and CommissioningProcedure 102Configuring the IP Softphone 2050 . . . . .
Page 190 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Installing the softwareTo install software and enter basic system
Installing a Signaling Server Page 191 of 466Communication Server 1000E Installation and CommissioningFigure 61Nortel CP PM system BIOS configuratio
Page 192 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 62VxWorks system banner When the Install Tool banner appea
Installing a Signaling Server Page 193 of 466Communication Server 1000E Installation and CommissioningFigure 63Install Tool banner screen 3 Press &l
Page 194 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008The system verifies the file systems. • If the hard drive of the
Installing a Signaling Server Page 195 of 466Communication Server 1000E Installation and CommissioningFigure 65Date and time• When reinstalling the
Page 196 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 66System SummaryCS 1000 Signaling Server Software Install
Installing a Signaling Server Page 197 of 466Communication Server 1000E Installation and CommissioningFigure 67Install Tool Main Menu4 At the Main M
Page 198 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008The Dependency Lists installation screen appears (Figure 68).Figu
Installing a Signaling Server Page 199 of 466Communication Server 1000E Installation and CommissioningFigure 69Installation Status6 Enter y to start
Page 20 of 466 List of ProceduresNN43041-310 Standard 01.11 October 2008
Page 200 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 70Installation outputFigure 71Software installation succes
Installing a Signaling Server Page 201 of 466Communication Server 1000E Installation and CommissioningFigure 72IP Phone firmwareFigure 73Voice Gatew
Page 202 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 74Restore IP configuration8 Do one of the following:• If y
Installing a Signaling Server Page 203 of 466Communication Server 1000E Installation and CommissioningFigure 75IP telephony parameter confirmation9
Page 204 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 76Signaling Server role selection10 Configure the Signalin
Installing a Signaling Server Page 205 of 466Communication Server 1000E Installation and CommissioningFigure 77Follower Signaling Server configurati
Page 206 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 200811 Configure the application configuration for this Signaling Ser
Installing a Signaling Server Page 207 of 466Communication Server 1000E Installation and CommissioningFigure 80Network Routing Service (NRS) — stand
Page 208 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 81NRS type — co-resident Signaling ServerFigure 82NRS type
Installing a Signaling Server Page 209 of 466Communication Server 1000E Installation and CommissioningDepending on whether the Signaling Server is c
Page 21 of 466Communication Server 1000E Installation and Commissioning22Revision historyOctober 2008Standard 01.11. This document is up-issued to ref
Page 210 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 84Stand-alone Signaling Server configuration14 Enter the d
Installing a Signaling Server Page 211 of 466Communication Server 1000E Installation and CommissioningTLAN subnet parameters as required. The Call S
Page 212 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008— Enter the address of the Primary NRS (optional).— If you did en
Installing a Signaling Server Page 213 of 466Communication Server 1000E Installation and Commissioning16 Enter <CR> or y to confirm the parame
Page 214 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 88Installation Status Summary18 Press <CR> to exit t
Installing a Signaling Server Page 215 of 466Communication Server 1000E Installation and CommissioningFigure 89Install Tool Main MenuFigure 90QuitCS
Page 216 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 200819 Remove the Signaling Server Software CD or the Signaling Serve
Installing a Signaling Server Page 217 of 466Communication Server 1000E Installation and Commissioning– Primary and Alternate NRS IP addresses for t
Page 218 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 20082 Press <CR> to continue with the configuration. The Restor
Installing a Signaling Server Page 219 of 466Communication Server 1000E Installation and Commissioning4 Enter the location (loop and shelf) of the I
Page 22 of 466 Revision historyNN43041-310 Standard 01.11 October 2008June 2007Standard 01.03. This document is up-issued with corrections from CR Q0
Page 220 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 95Follower Signaling Server configuration7 If there is not
Installing a Signaling Server Page 221 of 466Communication Server 1000E Installation and Commissioning8 Configure the application configuration for
Page 222 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 97Standalone Signaling Server - NRSFigure 98NRS type — co-
Installing a Signaling Server Page 223 of 466Communication Server 1000E Installation and CommissioningDepending on whether the Signaling Server is c
Page 224 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 101Stand-alone Signaling Server configuration10 Enter the
Installing a Signaling Server Page 225 of 466Communication Server 1000E Installation and CommissioningFigure 102IP Telephony parameter configuration
Page 226 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Depending on whether the Signaling Server is configured as Primar
Installing a Signaling Server Page 227 of 466Communication Server 1000E Installation and Commissioning— If you did enter the address of the Primary
Page 228 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 200812 Press <CR> or enter y to confirm all parameters entered,
Installing a Signaling Server Page 229 of 466Communication Server 1000E Installation and CommissioningFigure 106Install tool13 Enter q to quit the I
Page 23 of 466Communication Server 1000E Installation and Commissioning24How to get helpThis section explains how to get help for Nortel products and
Page 230 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 107Installation Tool quit confirmation14 Enter q to close/
Installing a Signaling Server Page 231 of 466Communication Server 1000E Installation and CommissioningProcedure 45Adding a Follower Signaling Server
Page 232 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 108Node Configuration web page5 Click Edit next to the nod
Installing a Signaling Server Page 233 of 466Communication Server 1000E Installation and CommissioningFigure 109Edit web page6 Click Add next to Sig
Page 234 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Figure 110Signaling Server properties template7 Enter the informa
Installing a Signaling Server Page 235 of 466Communication Server 1000E Installation and Commissioning8 Click Save and Transfer to transfer the upda
Page 236 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008Procedure 46Logging in to the Signaling ServerBefore you begin, m
Installing a Signaling Server Page 237 of 466Communication Server 1000E Installation and CommissioningVerifying a successful configurationTo ensure
Page 238 of 466 Installing a Signaling ServerNN43041-310 Standard 01.11 October 2008
Page 239 of 466Communication Server 1000E Installation and Commissioning250Configuring the IPMGContentsThis section contains information on the follow
Page 24 of 466 How to get helpNN43041-310 Standard 01.11 October 2008Outside North America, go to the following Web site to obtain the phone number f
Page 240 of 466 Configuring the IPMGNN43041-310 Standard 01.11 October 2008Procedure 48Configuring the IPMG (Element Manager)1 In Element Manager, se
Configuring the IPMG Page 241 of 466Communication Server 1000E Installation and CommissioningFigure 112IPMG MGC configuration4 Once configuration of
Page 242 of 466 Configuring the IPMGNN43041-310 Standard 01.11 October 2008Figure 113Media GatewaysThe following screen appears (see Figure 114):6 In
Configuring the IPMG Page 243 of 466Communication Server 1000E Installation and CommissioningThe following screen appears (Figure 115): The MGC has
Page 244 of 466 Configuring the IPMGNN43041-310 Standard 01.11 October 2008Procedure 49Configure conference TDS (CLI)1 Enter LD 17.>LD 17 CFN000
Configuring the IPMG Page 245 of 466Communication Server 1000E Installation and CommissioningProcedure 50 describes how to configure conference TDS
Page 246 of 466 Configuring the IPMGNN43041-310 Standard 01.11 October 2008Figure 117Loop configurationThe TDS loop configuration page appears (see F
Configuring the IPMG Page 247 of 466Communication Server 1000E Installation and Commissioning5 Click Save. It does not become available until a loop
Page 248 of 466 Configuring the IPMGNN43041-310 Standard 01.11 October 2008Configuring DSP Daughterboard Voice gateway channelsProcedure 51 describes
Configuring the IPMG Page 249 of 466Communication Server 1000E Installation and CommissioningZONE 004 ...End of Procedure
Page 25 of 466Communication Server 1000E Installation and Commissioning26Finding the latest updates on the Nortel web siteThe content of this document
Page 250 of 466 Configuring the IPMGNN43041-310 Standard 01.11 October 2008
Page 251 of 466Communication Server 1000E Installation and Commissioning264Connecting an IR-8020M-101 Terminal ServerContentsThis section contains inf
Page 252 of 466 Connecting an IR-8020M-101 Terminal ServerNN43041-310 Standard 01.11 October 2008information on connecting the MRV LX8020S-102AC-R, s
Connecting an IR-8020M-101 Terminal Server Page 253 of 466Communication Server 1000E Installation and CommissioningThis chapter contains the followi
Page 254 of 466 Connecting an IR-8020M-101 Terminal ServerNN43041-310 Standard 01.11 October 2008Customer-made cables with the following pin out (as
Connecting an IR-8020M-101 Terminal Server Page 255 of 466Communication Server 1000E Installation and Commissioning4 Configure HyperTerminal to comm
Page 256 of 466 Connecting an IR-8020M-101 Terminal ServerNN43041-310 Standard 01.11 October 20083 Configure the Terminal Server’s IP primary gateway
Connecting an IR-8020M-101 Terminal Server Page 257 of 466Communication Server 1000E Installation and CommissioningTelnet CS 1000E COM port from a P
Page 258 of 466 Connecting an IR-8020M-101 Terminal ServerNN43041-310 Standard 01.11 October 2008b. Enter the Input telnet command. Enter the command
Connecting an IR-8020M-101 Terminal Server Page 259 of 466Communication Server 1000E Installation and CommissioningWhere:xx = port number2 Enable a
Page 26 of 466 Finding the latest updates on the Nortel web siteNN43041-310 Standard 01.11 October 2008
Page 260 of 466 Connecting an IR-8020M-101 Terminal ServerNN43041-310 Standard 01.11 October 20085 Enable autoconnect for the port. Enter the command
Connecting an IR-8020M-101 Terminal Server Page 261 of 466Communication Server 1000E Installation and Commissioning9 Check port configuration. Enter
Page 262 of 466 Connecting an IR-8020M-101 Terminal ServerNN43041-310 Standard 01.11 October 20087 Define a user name for the port. Enter the command
Connecting an IR-8020M-101 Terminal Server Page 263 of 466Communication Server 1000E Installation and CommissioningCS 1000E COM port typesTable 19 l
Page 264 of 466 Connecting an IR-8020M-101 Terminal ServerNN43041-310 Standard 01.11 October 2008
Page 265 of 466Communication Server 1000E Installation and Commissioning278Connecting an MRV LX8020S-102AC-R Terminal Server ContentsThis section cont
Page 266 of 466 Connecting an MRV LX8020S-102AC-R Terminal ServerNN43041-310 Standard 01.11 October 2008For information on connecting the IR-8020M-10
Connecting an MRV LX8020S-102AC-R Terminal Server Page 267 of 466Communication Server 1000E Installation and Commissioningmask address and gateway a
Page 268 of 466 Connecting an MRV LX8020S-102AC-R Terminal ServerNN43041-310 Standard 01.11 October 2008Configuring a Terminal ServerFollow Procedure
Connecting an MRV LX8020S-102AC-R Terminal Server Page 269 of 466Communication Server 1000E Installation and CommissioningProcedure 59Connecting a T
Page 27 of 466Communication Server 1000E Installation and Commissioning30System informationThis document is a global document. Contact your system sup
Page 270 of 466 Connecting an MRV LX8020S-102AC-R Terminal ServerNN43041-310 Standard 01.11 October 2008SystemEnd of ProcedureConfiguring the Termina
Connecting an MRV LX8020S-102AC-R Terminal Server Page 271 of 466Communication Server 1000E Installation and CommissioningTelnet Terminal Server vir
Page 272 of 466 Connecting an MRV LX8020S-102AC-R Terminal ServerNN43041-310 Standard 01.11 October 2008Follow Procedure 62 to establish access to a
Connecting an MRV LX8020S-102AC-R Terminal Server Page 273 of 466Communication Server 1000E Installation and Commissioningxxx.xx.x.xx = Terminal Ser
Page 274 of 466 Connecting an MRV LX8020S-102AC-R Terminal ServerNN43041-310 Standard 01.11 October 2008a. Connect to the management port or virtual
Connecting an MRV LX8020S-102AC-R Terminal Server Page 275 of 466Communication Server 1000E Installation and CommissioningInReach:0>>configure
Page 276 of 466 Connecting an MRV LX8020S-102AC-R Terminal ServerNN43041-310 Standard 01.11 October 2008Note 1: It is not advisable to use putty soft
Connecting an MRV LX8020S-102AC-R Terminal Server Page 277 of 466Communication Server 1000E Installation and CommissioningLogin 5 Log in to the LX-s
Page 278 of 466 Connecting an MRV LX8020S-102AC-R Terminal ServerNN43041-310 Standard 01.11 October 2008P0609205 MIRAN L-adapter 9-pin DTE (male)NTDU
Page 279 of 466Communication Server 1000E Installation and Commissioning286Configuring a terminal and SDI portsContentsThis section contains informati
Page 28 of 466 System informationNN43041-310 Standard 01.11 October 2008Technical Documentation link under Support & Training on the Nortel home
Page 280 of 466 Configuring a terminal and SDI portsNN43041-310 Standard 01.11 October 2008Setting the TTY terminal portA TTY terminal can be any sta
Configuring a terminal and SDI ports Page 281 of 466Communication Server 1000E Installation and CommissioningFigure 121VT220 setup valuesCS 1000E CP
Page 282 of 466 Configuring a terminal and SDI portsNN43041-310 Standard 01.11 October 2008• Parity - none• Flow control - noneThe baudrate setting c
Configuring a terminal and SDI ports Page 283 of 466Communication Server 1000E Installation and CommissioningSDI2 is not available during the MGC bo
Page 284 of 466 Configuring a terminal and SDI portsNN43041-310 Standard 01.11 October 2008Procedure 65Connecting SDI ports on the Media Gateways1 Co
Configuring a terminal and SDI ports Page 285 of 466Communication Server 1000E Installation and CommissioningBayStack 470 SDI connectionThe SDI port
Page 286 of 466 Configuring a terminal and SDI portsNN43041-310 Standard 01.11 October 2008to Serial/ELAN/TLAN adapter provides an alternative to the
Page 287 of 466Communication Server 1000E Installation and Commissioning316Installing and cross-connecting a trunk cardContentsThis section contains i
Page 288 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Figure 124 shows the circuit card slots in a Media
Installing and cross-connecting a trunk card Page 289 of 466Communication Server 1000E Installation and CommissioningFigure 125Circuit card assignme
System information Page 29 of 466Communication Server 1000E Installation and Commissioning• Element Manager: System Administration (NN43001-632)• IP
Page 290 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Before you proceed, install the cable from the slo
Installing and cross-connecting a trunk card Page 291 of 466Communication Server 1000E Installation and CommissioningFigure 126Antistatic wrist stra
Page 292 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008• NTRB21 TMDI 1.5 Mbit DTI/PRI• NT6D70 SILC • NT6D
Installing and cross-connecting a trunk card Page 293 of 466Communication Server 1000E Installation and CommissioningNote: See “Installing and cross
Page 294 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Table 25NT8D14 Universal Trunk connections (Part 1
Installing and cross-connecting a trunk card Page 295 of 466Communication Server 1000E Installation and Commissioning13T13RBK-GG-BK6T6R6T6R6T6R614T1
Page 296 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008E&M Trunk card connectionsTable 26 lists the c
Installing and cross-connecting a trunk card Page 297 of 466Communication Server 1000E Installation and Commissioning9T9RR-BRBR-R2T2R2T2R2TATBTATB10
Page 298 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Trunk connections (Europe)Trunk connections for Eu
Installing and cross-connecting a trunk card Page 299 of 466Communication Server 1000E Installation and Commissioning5T5RR-SS-R23510T2R2T2R2T2R26T6R
Page 3 of 466Communication Server 1000E Installation and Commissioning12ContentsList of Procedures . . . . . . . . . . . . . . . . . . . . . . . . . .
Page 30 of 466 System informationNN43041-310 Standard 01.11 October 2008
Page 300 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008T2R23510R-SS-R 2E1E23611BK-BLBL-BKM1M23712BK-OO-BK
Installing and cross-connecting a trunk card Page 301 of 466Communication Server 1000E Installation and Commissioning4T4RW-SS-W1305RARBTATB5T5RR-BLB
Page 302 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Table 30E&M TIE Trunk card (Part 1 of 2)Cables
Installing and cross-connecting a trunk card Page 303 of 466Communication Server 1000E Installation and Commissioning13T13RBK-GG-BK33813RARBRARB14T1
Page 304 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008TATB349R-BRBR-R2RARB3510R-SS-RTATB3813BK-GG-BK3RAR
Installing and cross-connecting a trunk card Page 305 of 466Communication Server 1000E Installation and CommissioningTable 33E&M 2-wire Music Tr
Page 306 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 20087T7RR-OO-R3327T3R3T3R3A3B38T8RR-GG-R338PPM3—C3Spar
Installing and cross-connecting a trunk card Page 307 of 466Communication Server 1000E Installation and CommissioningTable 35Central Office Trunk co
Page 308 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Trunk connections (UK)Trunk connections for the UK
Installing and cross-connecting a trunk card Page 309 of 466Communication Server 1000E Installation and CommissioningTable 36NT5K17 Direct Inward Di
Page 31 of 466Communication Server 1000E Installation and Commissioning34Safety instructionsContentsThis section contains information on the following
Page 310 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Note: The connections on the NT5K18 Exchange Line
Installing and cross-connecting a trunk card Page 311 of 466Communication Server 1000E Installation and CommissioningT3R3327R-OO-R 3338R-GG-RT4R4349
Page 312 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Note: The speech pairs on the NT5K19 card are pola
Installing and cross-connecting a trunk card Page 313 of 466Communication Server 1000E Installation and CommissioningT1R1316R-BLBL-R 1EM32&R-OO-
Page 314 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Table 40NT5K19 4W Type 1 mode terminationsPair Pin
Installing and cross-connecting a trunk card Page 315 of 466Communication Server 1000E Installation and CommissioningTable 41NT5K19 AC15 mode pair t
Page 316 of 466 Installing and cross-connecting a trunk cardNN43041-310 Standard 01.11 October 2008Verifying trunk functionalityYou can now use the t
Page 317 of 466Communication Server 1000E Installation and Commissioning348Installing and configuring a Voice Gateway Media CardContentsThis section c
Page 318 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008IntroductionThe Voice Gateway Media Card
Installing and configuring a Voice Gateway Media Card Page 319 of 466Communication Server 1000E Installation and Commissioning• Procedure 74: "
Page 32 of 466 Safety instructionsNN43041-310 Standard 01.11 October 2008Lifting system equipmentCare should be exercised when lifting system compone
Page 320 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Figure 127Node Configuration web page3 Cl
Installing and configuring a Voice Gateway Media Card Page 321 of 466Communication Server 1000E Installation and CommissioningFigure 128Edit web pag
Page 322 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Figure 129Cards 6 Save the node.a. Click
Installing and configuring a Voice Gateway Media Card Page 323 of 466Communication Server 1000E Installation and CommissioningDescription, Installat
Page 324 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008The Add VGW channels web page opens, as s
Installing and configuring a Voice Gateway Media Card Page 325 of 466Communication Server 1000E Installation and CommissioningFigure 132VGW channels
Page 326 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Procedure 69Configuring voice gateway cha
Installing and configuring a Voice Gateway Media Card Page 327 of 466Communication Server 1000E Installation and Commissioning4 Exit from LD 14. Ent
Page 328 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Installing a CompactFlashThe Voice Gatewa
Installing and configuring a Voice Gateway Media Card Page 329 of 466Communication Server 1000E Installation and CommissioningFigure 133CompactFlash
Safety instructions Page 33 of 466Communication Server 1000E Installation and CommissioningInstalling telephonesFollow these safety instructions whe
Page 330 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Procedure 70Installing the CompactFlash1
Installing and configuring a Voice Gateway Media Card Page 331 of 466Communication Server 1000E Installation and Commissioning4 Insert the CompactFl
Page 332 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Press the Retaining Pin into the hole unt
Installing and configuring a Voice Gateway Media Card Page 333 of 466Communication Server 1000E Installation and CommissioningInstalling a card in a
Page 334 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Figure 142Media Gateway Expander card slo
Installing and configuring a Voice Gateway Media Card Page 335 of 466Communication Server 1000E Installation and CommissioningTable 44TN assignments
Page 336 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008c. Hook the locking devices.Note: The Voi
Installing and configuring a Voice Gateway Media Card Page 337 of 466Communication Server 1000E Installation and CommissioningFigure 143Node Mainten
Page 338 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Where xx.xxx.xxx.xxx is the ELAN IP addre
Installing and configuring a Voice Gateway Media Card Page 339 of 466Communication Server 1000E Installation and CommissioningFigure 145General Comm
Page 34 of 466 Safety instructionsNN43041-310 Standard 01.11 October 2008• Some equipment has a three-wire grounding plug. This type of plug has a th
Page 340 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Figure 146vgwShowAll resultThe following
Installing and configuring a Voice Gateway Media Card Page 341 of 466Communication Server 1000E Installation and CommissioningProcedure 74Displaying
Page 342 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Figure 148Maintenance (by functionality)
Installing and configuring a Voice Gateway Media Card Page 343 of 466Communication Server 1000E Installation and CommissioningFigure 149Network &
Page 344 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Procedure 75Displaying the status of one
Installing and configuring a Voice Gateway Media Card Page 345 of 466Communication Server 1000E Installation and CommissioningThe list in the web pa
Page 346 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008The Network and Peripheral Diagnostics we
Installing and configuring a Voice Gateway Media Card Page 347 of 466Communication Server 1000E Installation and CommissioningThe output from this c
Page 348 of 466 Installing and configuring a Voice Gateway Media CardNN43041-310 Standard 01.11 October 2008Verifying functionalityYou can now use th
Page 349 of 466Communication Server 1000E Installation and Commissioning360Installing the Main Distribution FrameContentsThis section contains informa
Page 35 of 466Communication Server 1000E Installation and Commissioning38Installation summaryContentsThis section contains information on the followin
Page 350 of 466 Installing the Main Distribution FrameNN43041-310 Standard 01.11 October 2008Terminal block requirementsThe cross-connect terminal re
Installing the Main Distribution Frame Page 351 of 466Communication Server 1000E Installation and Commissioning3 Attach labels on the cross-connect
Page 352 of 466 Installing the Main Distribution FrameNN43041-310 Standard 01.11 October 2008Installing a Krone Test Jack Frame for the UKThe Krone T
Installing the Main Distribution Frame Page 353 of 466Communication Server 1000E Installation and CommissioningFigure 15125-pair cable on three Kron
Page 354 of 466 Installing the Main Distribution FrameNN43041-310 Standard 01.11 October 2008Procedure 81 describes how to install the Krone Test Jac
Installing the Main Distribution Frame Page 355 of 466Communication Server 1000E Installation and CommissioningFigure 152Typical Krone cross-connect
Page 356 of 466 Installing the Main Distribution FrameNN43041-310 Standard 01.11 October 2008Connecting the cables to the Media GatewaysEach Media Ga
Installing the Main Distribution Frame Page 357 of 466Communication Server 1000E Installation and CommissioningFigure 153Cable connectors at the bac
Page 358 of 466 Installing the Main Distribution FrameNN43041-310 Standard 01.11 October 20084 Tighten the velcro straps when you have connected each
Installing the Main Distribution Frame Page 359 of 466Communication Server 1000E Installation and Commissioning8 When auxiliary power is required fr
Page 36 of 466 Installation summaryNN43041-310 Standard 01.11 October 2008the CS 1000E system, see “Installing and configuring Nortel IP Phones” on p
Page 360 of 466 Installing the Main Distribution FrameNN43041-310 Standard 01.11 October 2008
Page 361 of 466Communication Server 1000E Installation and Commissioning378Configuring an IP telephony nodeContentsThis section contains information o
Page 362 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008The preconfigured IP telephony configuration files from the le
Configuring an IP telephony node Page 363 of 466Communication Server 1000E Installation and CommissioningLimited Access to Overlays, see Features an
Page 364 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008Figure 156Internet Explorer – Internet Options 3 On the Genera
Configuring an IP telephony node Page 365 of 466Communication Server 1000E Installation and CommissioningFigure 157Temporary Internet files – Settin
Page 366 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008Logging in to Element ManagerFollow Procedure 84 to log in to
Configuring an IP telephony node Page 367 of 466Communication Server 1000E Installation and CommissioningFigure 158Element Manager loginEnd of Proce
Page 368 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008Importing preconfigured IP telephony filesFollow Procedure 85
Configuring an IP telephony node Page 369 of 466Communication Server 1000E Installation and Commissioning1 Select IP Network > Node: Servers, Med
Installation summary Page 37 of 466Communication Server 1000E Installation and CommissioningInstalling and cross-connecting a PowerFailTransferUnit4
Page 370 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008Figure 161Import Node Files web page3 Click Import. Click OK i
Configuring an IP telephony node Page 371 of 466Communication Server 1000E Installation and CommissioningNote 1: Clicking Transfer / Status displays
Page 372 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008Figure 162Transfer Progress – Starting Figure 163Transfer Prog
Configuring an IP telephony node Page 373 of 466Communication Server 1000E Installation and CommissioningFigure 164Transfer Progress – Complete5 Cli
Page 374 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008The previous status of the node displays, and the failure reas
Configuring an IP telephony node Page 375 of 466Communication Server 1000E Installation and CommissioningIn Element Manager:1 Click Edit on the Node
Page 376 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008datadump backs up new IP Telephony node files on the CS 1000E
Configuring an IP telephony node Page 377 of 466Communication Server 1000E Installation and CommissioningEnd of Procedure
Page 378 of 466 Configuring an IP telephony nodeNN43041-310 Standard 01.11 October 2008
Page 379 of 466Communication Server 1000E Installation and Commissioning390Installing Line cards andcross-connecting telephonesContentsThis section co
Page 38 of 466 Installation summaryNN43041-310 Standard 01.11 October 2008
Page 380 of 466 Installing Line cards and cross-connecting telephonesNN43041-310 Standard 01.11 October 2008Before you proceed, install the cable fro
Installing Line cards and cross-connecting telephones Page 381 of 466Communication Server 1000E Installation and CommissioningFigure 167Circuit card
Page 382 of 466 Installing Line cards and cross-connecting telephonesNN43041-310 Standard 01.11 October 2008Circuit cards featuresIf a circuit card h
Installing Line cards and cross-connecting telephones Page 383 of 466Communication Server 1000E Installation and CommissioningFigure 169NE-500/2500-
Page 384 of 466 Installing Line cards and cross-connecting telephonesNN43041-310 Standard 01.11 October 2008Figure 170Digital telephone cross connect
Installing Line cards and cross-connecting telephones Page 385 of 466Communication Server 1000E Installation and CommissioningProcedure 90Connecting
Page 386 of 466 Installing Line cards and cross-connecting telephonesNN43041-310 Standard 01.11 October 2008Procedure 91Connecting an off-premise tel
Installing Line cards and cross-connecting telephones Page 387 of 466Communication Server 1000E Installation and CommissioningFigure 171NTAK92BA Off
Page 388 of 466 Installing Line cards and cross-connecting telephonesNN43041-310 Standard 01.11 October 2008Figure 172Attendant console connections C
Installing Line cards and cross-connecting telephones Page 389 of 466Communication Server 1000E Installation and CommissioningEnd of ProcedureTable
Page 39 of 466Communication Server 1000E Installation and Commissioning80System componentsContentsThis section contains information on the following t
Page 390 of 466 Installing Line cards and cross-connecting telephonesNN43041-310 Standard 01.11 October 2008
Page 391 of 466Communication Server 1000E Installation and Commissioning436Installing and configuring Nortel IP PhonesContentsThis section contains in
Page 392 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008IntroductionFor detailed information on the various
Installing and configuring Nortel IP Phones Page 393 of 466Communication Server 1000E Installation and CommissioningPackage components for the Norte
Page 394 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008Handset, Charcoal A0758634Handset cord, Ethergray;
Installing and configuring Nortel IP Phones Page 395 of 466Communication Server 1000E Installation and CommissioningTable 48 lists the Nortel IP Pho
Page 396 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008Handset cord, Ethergray A0897725Handset cord, Charc
Installing and configuring Nortel IP Phones Page 397 of 466Communication Server 1000E Installation and CommissioningTable 49 lists the Nortel IP Pho
Page 398 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008Replacement parts7 ft. Ethernet Cat5 cable A0648375
Installing and configuring Nortel IP Phones Page 399 of 466Communication Server 1000E Installation and CommissioningTable 50 lists the Nortel IP Pho
Page 4 of 466 Contents NN43041-310 Standard 01.11 October 2008Using telephones .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Page 40 of 466 System componentsNN43041-310 Standard 01.11 October 2008IntroductionSupported configurationsThe following CS 1000E system configuratio
Page 400 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008Table 51 lists the Nortel IP Phone ACP 2033 package
Installing and configuring Nortel IP Phones Page 401 of 466Communication Server 1000E Installation and CommissioningTable 52 lists the Package compo
Page 402 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008WLAN Handset 2211 kit North America)WLAN Handset 22
Installing and configuring Nortel IP Phones Page 403 of 466Communication Server 1000E Installation and CommissioningWLAN Application Gateway 224664
Page 404 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008Power supplies —WLAN Handset 2211 Gang Charger:• No
Installing and configuring Nortel IP Phones Page 405 of 466Communication Server 1000E Installation and CommissioningConnectivity and power requireme
Page 406 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008• Procedure 105: "Displaying registered IP Pho
Installing and configuring Nortel IP Phones Page 407 of 466Communication Server 1000E Installation and Commissioning5 Exit from LD 117. Enter the co
Page 408 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008End of ProcedureConfiguring virtual superloopsFollo
Installing and configuring Nortel IP Phones Page 409 of 466Communication Server 1000E Installation and CommissioningProcedure 95Configuring the IP P
System components Page 41 of 466Communication Server 1000E Installation and Commissioning• 19-inch rack• Uninterruptible Power Supply (UPS)CS 1000E
Page 410 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008CLS ADD Class of ServiceADD - Automatic Digit Displ
Installing and configuring Nortel IP Phones Page 411 of 466Communication Server 1000E Installation and CommissioningKey number limits that can be as
Page 412 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008On the M3903, keys 4-15 are blocked. No feature ass
Installing and configuring Nortel IP Phones Page 413 of 466Communication Server 1000E Installation and Commissioning3 Configure the dedicated soft k
Page 414 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 20084 Repeat Steps 2 and 3 for each Nortel IP Phone.End
Installing and configuring Nortel IP Phones Page 415 of 466Communication Server 1000E Installation and Commissioning3 Click the desired node to expa
Page 416 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 20089 Enter the administrator Nortel IP Phone Installer
Installing and configuring Nortel IP Phones Page 417 of 466Communication Server 1000E Installation and CommissioningThe temporary password is set.Fi
Page 418 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008f. Handset cordFigure 176Nortel IP Phone 2004 compo
Installing and configuring Nortel IP Phones Page 419 of 466Communication Server 1000E Installation and Commissioning2 Connect one end of the CAT5 li
Page 42 of 466 System componentsNN43041-310 Standard 01.11 October 2008• Media Gateway Expander• BayStack 470 Switch• MRV Terminal Server• System cab
Page 420 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008Figure 177Nortel IP Phone connectionsEnd of Procedu
Installing and configuring Nortel IP Phones Page 421 of 466Communication Server 1000E Installation and CommissioningConfiguring the Nortel IP Phone
Page 422 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008Entering Nortel IP Phone boot parameters using manu
Installing and configuring Nortel IP Phones Page 423 of 466Communication Server 1000E Installation and Commissioning7 Enter the default gateway.The
Page 424 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008b. Enter 1 to configure manual VLAN.The Nortel IP P
Installing and configuring Nortel IP Phones Page 425 of 466Communication Server 1000E Installation and Commissioning17 Enter the Nortel IP Phone’s (
Page 426 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008VLAN?(0-No,1-Ma,2-Au)0 6 Choose one of the followin
Installing and configuring Nortel IP Phones Page 427 of 466Communication Server 1000E Installation and Commissioning9 Enter the node number and the
Page 428 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008c. Press the OK key to accept your selection.The No
Installing and configuring Nortel IP Phones Page 429 of 466Communication Server 1000E Installation and Commissioning11 Choose one of the following:a
System components Page 43 of 466Communication Server 1000E Installation and CommissioningNote: For all configurations, a COTS Signaling Server may b
Page 430 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 200814 Enter the node number and the temporary or admin
Installing and configuring Nortel IP Phones Page 431 of 466Communication Server 1000E Installation and CommissioningNode: xTN: x.x1 Enter the node n
Page 432 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008The system response, displayed on the Nortel IP Pho
Installing and configuring Nortel IP Phones Page 433 of 466Communication Server 1000E Installation and CommissioningProcedure 102Configuring the IP
Page 434 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008installed, you can still choose it as the audio dev
Installing and configuring Nortel IP Phones Page 435 of 466Communication Server 1000E Installation and CommissioningRunning the IP Softphone 2050 fo
Page 436 of 466 Installing and configuring Nortel IP PhonesNN43041-310 Standard 01.11 October 2008Verifying Nortel IP Phone functionalityYou can now
Page 437 of 466Communication Server 1000E Installation and Commissioning450Installing and cross-connecting a Power Fail Transfer UnitContentsThis sect
Page 438 of 466 Installing and cross-connecting a Power Fail Transfer UnitNN43041-310 Standard 01.11 October 2008The following procedures are provide
Installing and cross-connecting a Power Fail Transfer Unit Page 439 of 466Communication Server 1000E Installation and Commissioning4 Connect the PFT
Page 44 of 466 System componentsNN43041-310 Standard 01.11 October 2008Figure 1CS 1000E CP PM Call Server
Page 440 of 466 Installing and cross-connecting a Power Fail Transfer UnitNN43041-310 Standard 01.11 October 2008Figure 180AUX cable connector on Med
Installing and cross-connecting a Power Fail Transfer Unit Page 441 of 466Communication Server 1000E Installation and Commissioning3T W-G (TC) Conso
Page 442 of 466 Installing and cross-connecting a Power Fail Transfer UnitNN43041-310 Standard 01.11 October 2008Figure 181Power fail transferEnd of
Installing and cross-connecting a Power Fail Transfer Unit Page 443 of 466Communication Server 1000E Installation and CommissioningInstalling and co
Page 444 of 466 Installing and cross-connecting a Power Fail Transfer UnitNN43041-310 Standard 01.11 October 2008Connecting an analog (500/2500-type)
Installing and cross-connecting a Power Fail Transfer Unit Page 445 of 466Communication Server 1000E Installation and CommissioningFigure 182Analog
Page 446 of 466 Installing and cross-connecting a Power Fail Transfer UnitNN43041-310 Standard 01.11 October 2008Procedure 107Connecting an analog (5
Installing and cross-connecting a Power Fail Transfer Unit Page 447 of 466Communication Server 1000E Installation and CommissioningPFT 29T9RR-BRBR-R
Page 448 of 466 Installing and cross-connecting a Power Fail Transfer UnitNN43041-310 Standard 01.11 October 2008End of ProcedureConnecting a trunk t
Installing and cross-connecting a Power Fail Transfer Unit Page 449 of 466Communication Server 1000E Installation and Commissioning6 Repeat for each
System components Page 45 of 466Communication Server 1000E Installation and CommissioningFigure 2CS 1000E CP PM Call Server (side view)Choosing the
Page 450 of 466 Installing and cross-connecting a Power Fail Transfer UnitNN43041-310 Standard 01.11 October 2008End of ProcedurePFT417T17RY- OO-YTel
Page 451 of 466Communication Server 1000E Installation and Commissioning456Installing and cross-connecting an external alarm from a PFTUContentsThis s
Page 452 of 466 Installing and cross-connecting an external alarm from a PFTUNN43041-310 Standard 01.11 October 2008Installing an alarm using an alar
Installing and cross-connecting an external alarm from a PFTU Page 453 of 466Communication Server 1000E Installation and CommissioningInstalling an
Page 454 of 466 Installing and cross-connecting an external alarm from a PFTUNN43041-310 Standard 01.11 October 2008Figure 183Contacts in PFTU Table
Installing and cross-connecting an external alarm from a PFTU Page 455 of 466Communication Server 1000E Installation and CommissioningPFT29T9RR-BRBR
Page 456 of 466 Installing and cross-connecting an external alarm from a PFTUNN43041-310 Standard 01.11 October 2008PFT521T21RV-BLBL-VMakes with 22T
Page 457 of 466Communication Server 1000E Installation and Commissioning462Basic system telephony configurationContentsThis section contains informati
Page 458 of 466 Basic system telephony configurationNN43041-310 Standard 01.11 October 2008See Software Input/Output: Administration (NN43001-611) fo
Basic system telephony configuration Page 459 of 466Communication Server 1000E Installation and CommissioningFigure 184Data-entry-sequence for new s
Page 46 of 466 System componentsNN43041-310 Standard 01.11 October 2008For CS 1000 Release 5.0, the CP PM call server processor sits in one of the sl
Page 460 of 466 Basic system telephony configurationNN43041-310 Standard 01.11 October 2008Figure 185Configuration RecordConfiguration Record 1LD 17C
Basic system telephony configuration Page 461 of 466Communication Server 1000E Installation and CommissioningFigure 186Customer Data Block553-A059Cu
Page 462 of 466 Basic system telephony configurationNN43041-310 Standard 01.11 October 2008TN assignmentTable 65 shows the TN assignments for the MG
Page 463 of 466Communication Server 1000E Installation and Commissioning466Configuring IP Peer Networking and managing the Gatekeeper databaseContents
Page 464 of 466 Configuring IP Peer Networking and managing the Gatekeeper databaseNN43041-310 Standard 01.11 October 2008You must configure the foll
Configuring IP Peer Networking and managing the Gatekeeper database Page 465 of 466Communication Server 1000E Installation and Commissioning5 Config
Page 466 of 466 Configuring IP Peer Networking and managing the Gatekeeper databaseNN43041-310 Standard 01.11 October 2008
Family Product Manual Contacts Copyright FCC notice Trademarks Document number Product release Document release Date PublishNortel Communication Serve
System components Page 47 of 466Communication Server 1000E Installation and CommissioningFigure 3CS 1000E CP PM Call Server system overviewCP-PM Fac
Page 48 of 466 System componentsNN43041-310 Standard 01.11 October 2008• Green: Normal Operation• Flashing Green: SL1 Loading (on Active Core only)•
System components Page 49 of 466Communication Server 1000E Installation and CommissioningHSP RJ45 right• Off: 10 Mbps• Yellow: 100 Mbps• Green: 1000
Contents Page 5 of 466Communication Server 1000E Installation and CommissioningRack-mounting a Media Gateway or Media Gateway Expander . . . . . 84
Page 50 of 466 System componentsNN43041-310 Standard 01.11 October 2008Figure 4CS 1000E CP PM Call Server CP PM CS Serial Data Interface (SDI)The CP
System components Page 51 of 466Communication Server 1000E Installation and CommissioningThe TTY Settings are:• Baud Rate: 9600• Data bit: 8• Stop b
Page 52 of 466 System componentsNN43041-310 Standard 01.11 October 2008CP PM Call Server Customer Database TransferAll CP PII databases must be copie
System components Page 53 of 466Communication Server 1000E Installation and CommissioningThe ISP1100 Signaling Server, as shown in Figure 5 and desc
Page 54 of 466 System componentsNN43041-310 Standard 01.11 October 2008Power • Power status indicator (green LED) is located on the unit’s faceplate.
System components Page 55 of 466Communication Server 1000E Installation and CommissioningFor detailed information about the ISP1100 Signaling Server
Page 56 of 466 System componentsNN43041-310 Standard 01.11 October 2008Figure 6Connectors on the front of the ISP1100 Signaling ServerMaintenance por
System components Page 57 of 466Communication Server 1000E Installation and CommissioningFigure 7Connectors at the back of the ISP1100 Signaling Ser
Page 58 of 466 System componentsNN43041-310 Standard 01.11 October 2008Keying will prevent the NTDW61 circuit card from being inserted into this slot
System components Page 59 of 466Communication Server 1000E Installation and Commissioningdaughterboard. These daughterboards provide DSP resources f
Page 6 of 466 Contents NN43041-310 Standard 01.11 October 2008Configuring initial IP configuration data on MGC .. . . . . . . . . . . . . . . 143Conf
Page 60 of 466 System componentsNN43041-310 Standard 01.11 October 2008Cooling • Provided by the Media Gateway or Media Gateway Expander.Connectors (
System components Page 61 of 466Communication Server 1000E Installation and CommissioningFigure 8Media Card Media Gateway The media gateway is shown
Page 62 of 466 System componentsNN43041-310 Standard 01.11 October 2008Figure 9 5-pair Cable Connectors on the Media GatewayCAUTION — Damage to Equi
System components Page 63 of 466Communication Server 1000E Installation and CommissioningPower • Power status indicator (Nortel logo) is located on
Page 64 of 466 System componentsNN43041-310 Standard 01.11 October 2008Connectors(rear)• The 25-pair cable connectors at the back panel (see Figure 9
System components Page 65 of 466Communication Server 1000E Installation and CommissioningFigure 7Connectors at the back of the Media GatewaySDI Port
Page 66 of 466 System componentsNN43041-310 Standard 01.11 October 2008Figure 10Front of the Media GatewayPower statusindicatorsDIP switchsettingsPow
System components Page 67 of 466Communication Server 1000E Installation and CommissioningMedia Gateway ExpanderFigure 11 on page 67 shows the Media
Page 68 of 466 System componentsNN43041-310 Standard 01.11 October 2008Power • Power status indicator (Nortel logo) is located on the unit’s faceplat
System components Page 69 of 466Communication Server 1000E Installation and CommissioningCard slots • Four usable universal card slots: 7 to 10. See
Contents Page 7 of 466Communication Server 1000E Installation and CommissioningVerifying a successful configuration .. . . . . . . . . . . . . . . .
Page 70 of 466 System componentsNN43041-310 Standard 01.11 October 2008Figure 12Connectors at the back of the Media Gateway Expander 19-inch Rack Mou
System components Page 71 of 466Communication Server 1000E Installation and CommissioningBayStack 470 SwitchThe BayStack 470 Switch, described in Ta
Page 72 of 466 System componentsNN43041-310 Standard 01.11 October 2008For additional information, refer to Using the BayStack 470 Switch.Figure 13Et
System components Page 73 of 466Communication Server 1000E Installation and CommissioningA third-party data network switch can be used with the syst
Page 74 of 466 System componentsNN43041-310 Standard 01.11 October 2008The Terminal Server is configured to automatically log in to the active Core C
System components Page 75 of 466Communication Server 1000E Installation and Commissioning19-inch rackAll CS 1000E system components are mounted in a
Page 76 of 466 System componentsNN43041-310 Standard 01.11 October 2008Table 9CS 1000E cables (Part 1 of 2) Component Descriptions Cable KitsCables
System components Page 77 of 466Communication Server 1000E Installation and Commissioning100BaseT ConnectionSignaling Servers, Layer two switch (BS
Page 78 of 466 System componentsNN43041-310 Standard 01.11 October 2008Miscellaneous system componentsTable 10 contains a list of miscellaneous items
System components Page 79 of 466Communication Server 1000E Installation and CommissioningA UPS provides a continuous AC power supply. Refer to Commu
Page 8 of 466 Contents NN43041-310 Standard 01.11 October 2008Configuring a terminal and SDI ports . . . . . . . . . . 279Contents . . . . . . . . .
Page 80 of 466 System componentsNN43041-310 Standard 01.11 October 2008
Page 81 of 466Communication Server 1000E Installation and Commissioning90Rack-mounting the componentsContentsThis section contains information on the
Page 82 of 466 Rack-mounting the componentsNN43041-310 Standard 01.11 October 2008Note: In the 5u pattern, a “u” is equal to 1.75 in. and includes th
Rack-mounting the components Page 83 of 466Communication Server 1000E Installation and CommissioningGuidelines for component placement in a rackWhen
Page 84 of 466 Rack-mounting the componentsNN43041-310 Standard 01.11 October 2008Rack-mounting a Media Gateway or Media Gateway ExpanderReferences t
Rack-mounting the components Page 85 of 466Communication Server 1000E Installation and Commissioningupward to remove it from the Media Gateway. Refe
Page 86 of 466 Rack-mounting the componentsNN43041-310 Standard 01.11 October 2008Figure 16Unlock the coverEnd of ProcedureProcedure 2Rack-mounting a
Rack-mounting the components Page 87 of 466Communication Server 1000E Installation and CommissioningFigure 17Guide bracket installed in a rack2 Fast
Page 88 of 466 Rack-mounting the componentsNN43041-310 Standard 01.11 October 2008Figure 18Right ear bracket on a Media Gateway 4 Attach the left ear
Rack-mounting the components Page 89 of 466Communication Server 1000E Installation and Commissioninga. Use two #8-32 machine screws. Position the ea
Contents Page 9 of 466Communication Server 1000E Installation and CommissioningSaving configuration changes . . . . . . . . . . . . . . . . . . . .
Page 90 of 466 Rack-mounting the componentsNN43041-310 Standard 01.11 October 2008Rack-mounting a Terminal ServerFollow the manufacturer’s instructio
Page 91 of 466Communication Server 1000E Installation and Commissioning100Installing system groundsContentsThis section contains information on the fo
Page 92 of 466 Installing system groundsNN43041-310 Standard 01.11 October 2008Refer to your grounding plan for additional information.Installing a g
Installing system grounds Page 93 of 466Communication Server 1000E Installation and CommissioningFollow Procedure 3 to install a ground bar. Procedu
Page 94 of 466 Installing system groundsNN43041-310 Standard 01.11 October 2008Figure 20NTBK80 Ground BarEnd of ProcedureFollow Procedure 4 to instal
Installing system grounds Page 95 of 466Communication Server 1000E Installation and Commissioning2 Connect the NTDU6201 Ground Bar to the ground bus
Page 96 of 466 Installing system groundsNN43041-310 Standard 01.11 October 2008Procedure 5Grounding Media Gateways powered by the same electrical pan
Installing system grounds Page 97 of 466Communication Server 1000E Installation and Commissioning4 Test the ground.End of ProcedureGrounding a Media
Page 98 of 466 Installing system groundsNN43041-310 Standard 01.11 October 2008Follow Procedure 7 to ground a Media Gateway Expander.Procedure 7Groun
Installing system grounds Page 99 of 466Communication Server 1000E Installation and CommissioningFigure 22Grounding multiple pieces of equipment in